PP26-215 EN12a SBC System catalogue 2015/2016 - page 92

92
saia-pcd.com
Standby Controller
Standby Controller
Property
PCD3.T665
PCD3.T666/PCD3.T668
Number of inputs/outputs
64 in base unit, extensible to 256
I/O-module slots
4 in base unit, extensible to 16
I/O-modules supported
PCD3.Exxx, PCD3.Axxx, PCD3.Bxxx, PCD3.Wxxx
Max. number of RIO stations
128
Protocol for data transfer
Ether-S-IO
Ethernet connection
10/100 Mbit/s, full-duplex, auto-sensing, auto-crossing
Default IP configuration
IP address: 192.168.10.100
Subnet mask: 255.255.255.0
Default gateway: 0.0.0.0
USB port for configuration and diagnostics
yes
Programmemory
32 kByte
128 kByte
Web server for configuration and diagnostics
yes
Web server for user pages
yes
On-Board file system for web pages and data
512 kByte
BACnet® or
L
on
W
orks
®
no
no
On-Board interrupt inputs
2
On-Board RS-485 interface
no
yes
Special modules
for I/O-slot 0 only
---
PCD3.F1xx
for I/O-slots 0…3
(up to 4 modules)
PCD3.H1xx
---
---
PCD3.H1xx counter
PCD3.F26x DALI
PCD3.F27x M-Bus
S-Web alarming/trending
no
no
Watchdog
no
Real-time clock
no
Software clock (not battery-powered)
yes, synchronized by the Manager
Battery
no
Technical data
General data
Supply voltage
24 VDC ±20% smoothed or 19 VAC ±15% full-wave rectified
Capacity of 5 V bus / 24 V bus
max. 650 mA/100 mA
Ambient temperature
0…+55 °C or 0…+40 °C (depending on mounting position)
Storage temperature
–20…+70 °C
Relative humidity
30…95% RH with no condensation
Mechanical strength
according to EN/IEC61131-2
With lean automation, it is not recommended to make full use of the specified limits with regard to the maximum number of stations
per Manager and the maximum number of I/Os per RIO. The following points should be taken into account:
The load on the RIO Manager increases with the rising number of RIO stations. This has an impact on the overall
application in the RIO Manager.
If there is a large number of RIOs, a sufficiently large amount of PCD media must be reserved on the Manager
for the data transfer.
With a rising number of RIO stations, the build and download process in PG5 is lengthened accordingly.
Likewise, the start-up behavior of the Manager or the entire RIO network is proportionately longer.
Recommendations:
20 Smart RIOs per Manager is a sensible configuration for efficient and problem-free operation, and simple
commissioning and support.
The Smart RIOs do not have a battery. In the event of an interruption to the power supply, all the data in the RAM memory (registers,
flags, DBs/text) will be lost. Data and parameters that are to remain must either be transferred by the Manager or stored in the RIO’s
flash file system. If this is not possible, the use of a normal controller in place of a Smart RIO is recommended. The user programs are
stored in the flash memory of the RIOs and are retained in the event of an interruption to the power supply.
System properties/limits and recommendations for lean automation
A...,82,83,84,85,86,87,88,89,90,91 93,94,95,96,97,98,99,100,101,102,...Z
Powered by FlippingBook