The standard for building services
LonWorks® technology is a standardised communication protocol which is well-established in building and industrial automation systems. Properties such as the decentralised intelligence, modular design, requirement-based interfaces and the capability to adjust to existing infrastructures makes LonWorks® an interesting option for the transfer of data in the field layer and for backbone systems.
The individual network participants, the so-called nodes, are able to exchange event-controlled data among themselves.
LonWorks® forms the platform for manufacturer independent communication in multi-service building automation systems.
More information about LON FTT10 you find unter the following link.
Typical applications of a LonWorks® infrastructure
- Heating, ventilation and climate control
- Light control
- Shading control
- Security
- Energy management, etc.
PCD systems
The production of the LonWorks interface devices PCD2.F240, PCD3.F2400 and the LonWorks memory device PCD7.R582 was discontinued at the end of 2021 and the devices are no longer available.
As a replacement, we recommend the usage of BACnet.
LonWorks® is available as a communications option for practically all PCD systems. PCD classic controllers are connected to the Saia PG5® COSinus operating system via IP 852 (Ethernet). LON FTT10 is also possible using a communication module, whereby each module supports max. 254 network variables. The PG5 contains a suitable LON resource configurator for configuring the LON nodes and an FBox library for commissioning, testing, transmitting and receiving network variables.
A LON options module is always required for using the LON-over IP (IP 852). A PCD7.R58x is used for memory slots M1 or M2 for PCD3.M5/M6-, PCD2.M5-, PCD1.M2- and PCD1.M0 controllers. The PCD3.R58x module is available for I/O slots.
A “LON communication module” is also required to connect the LON FTT10. This module provides PCD controllers with a LonWorks® interface but without a router function. PCD1.M2 controllers require the PCD2.F2400 module and PCD3 controllers (see supported PCD3 devices in the table belwo) the PCD3.F240 module.
External LON FTT10- / IP gateways are also required to connect FTT10 devices directly to the management system or other LON IP 852 devices, for example. In place of a router, the application program can also copy network variables on IP 852 via PCD resources from any system.
PG5 LON Configurator and FBox Library
The FBox library can be used for communication control of LON IP (PCD7.R58x) and LON FTT10 (PCD3/2.F240x) modules. The Help describes the functionality of the different FBox modules. Please note that you'll still use the PG5 LON over IP or Lon FTT10 Configurator to create LonWorks node configurations. For detailed information about the work flow, please check out the Saia Lon Manual 26-883.
Documents
System Catalogue : LonWorks Networks
Extract | PP26-215_B0262 | System Catalogue : LonWorks Networks |
LonWorks for PCD COSinus
Manual | 26-883 | LonWorks for PCD COSinus |
Room Controller with LON PCD7.L611
Manual | 26-876 | Room Controller with LON PCD7.L611 |
LonWorks® Networks with Saia PCD
Manual | 26-767 | LonWorks® Networks with Saia PCD |
Single Room Controller with LON PCD7.L610
Manual | 26-873 | Single Room Controller with LON PCD7.L610 |
Single room controllers based on LON
Technical Info | PP26-341 | Single room controllers based on LON |
Firmware
LonIp firmware used in production
Firmware | 1.24.69/1.26.31/1.28.51 | LonIp firmware used in production |
LonIp FW and coresponding PCD FW for PCD1.M2xx0, PCD2.M4x60, PCD2.M5xx0, PCD3.Mxxx0, PCD3.Mxx60
Do use at least the PG5 firmware downloader version 2.1.311 or newer (included in PG5 patch 2.1.311 or newer) to prevent the loading of the FW 1.24.xx or 1.26.xx or newer to a not compatible PCD.
LonIP FW 1.24.69 / 1.26.31 / 1.28.51 | .zip | 15.53 MB | Download |
The actual COSinus FW 1.20.xx or higher for the PCD is available from the COSinus firmware page
FBox library
Good to know
The production of the LonWorks interface devices PCD2.F240, PCD3.F2400 and the LonWorks memory device PCD7.R582 was discontinued at the end of 2021 and the devices are no longer available.
|
More information about LON FTT10 you find unter the following link. |
Communication / LON (FTT10)
- Are the LonWorks devices PCD2.F240, PCD3.F2400 and PCD7.R582 still available? (FAQ #102064)
- LON Work: how many variables SNVT can be used on a PCD/PCS ? (FAQ #101296)
- Can I run BACnet and LON on the same PCD at the same time? (FAQ #101216)
- Why it’s not possible to make the binding with the LonMaker to a PCS1? (FAQ #101132)
- How to configure a LON interface on a PCD1 / PCD2? (FAQ #101075)