After downloading the program, the PCD goes in "Halt" with the halt reason "MGWY INIT FAIL". This is because the S-Bus gateway is defined on a port where no interface is present.
This error message can have two reasons; one caused by a TCP connection which has been closed by the server, of if the S-Bus connection is not working correctly.
Digital room control unit with S-Bus or Modbus interface Digital room operating device for multi-room applications and low installation cost trough 2 Pluggable RJ9 connectors for daisy chain up to 6 wall units, Integrated Room temperature sensor 0…40°C and Set point offset control ± 3°C in steps of 0.5°C, 7 LED for signalization of set point offset, RS-485 interface for S-Bus or Modbus communication PEHA Dialog Aluminium design
On a Profi S-Bus network when PCD7.D76_ terminals are connected to PCD3.Mxxx or PCD2.M480 PLC's over Profi S-Bus, the terminal loses the communication after some time and get even frozen. This problem is corrected in the new boot, FW and driver. The PCD8.D81 V 5.09 is needed , the attached files have to be copied in it (see procedure below). It is also necessary to update the PCD3.Mxxx and PCD2.M480 FW with the version PCD3.Mxxx_023.blk / PCD2.M480_$27 or newer! Ask the PCD technical support or your representation for it!
Pulse counter for collecting, converting and transmitting S0 pulses via S-Bus, with 4 S0 puls inputs, powered by 120 BAV, 50/60 Hz
Pulse counter for collecting, converting and transmitting S0 pulses via S-Bus, with 4 S0 puls inputs, powered by 120 BAV, 50/60 Hz
Due of an error on PG5 2.1.210, then IP-Node information is not stored correctly on the application program. This could lead to the situations that after a program download with PG5 2.1.210 the Ether-S-Bus communication doesn’t work anymore between some stations. To solve the problem, copy the attached file Spm52.exe (version 2.1.210.1 or higher) to the PG5 2.1.210 installation folder, compile again the concerned CPU and do load the concerned CPU to the PCD. This version will be included also in the next patch for PG5 2.1.210
-100.0 Communication on serial S-Bus fails while the AutoConfig Output of the Setup FBox stays '1'! (FAQ #101812) L60x Config, L60x Room [...] with use of the PCD7.L60x S-Bus room controllers (not LON [...] sensor to the input E2 (and select in the config FBox its functionality as dew point): If the dew point has to be set over the S-Bus or in the "Room" FBox, then it has to be used in minimum the
-100.0 Communication on serial S-Bus fails while the AutoConfig Output of the Setup FBox stays '1'! (FAQ #101812) L60x Config, L60x Room [...] with use of the PCD7.L60x S-Bus room controllers (not LON [...] sensor to the input E2 (and select in the config FBox its functionality as dew point): If the dew point has to be set over the S-Bus or in the "Room" FBox, then it has to be used in minimum the
Characteristics of the MP-Bus protocol - No special cable or line termination resistors - Costs saved due to reduced expenditure on cabling and easy handling - Simple commissioning and maintenance - Uncomplicated method for integrating and exchanging actuators - Compatible with BELIMO® actuators using MFT/MFT2 technology