TCP/IP network configuration

FAQ #100174

The whole Ethernet network must be defined in

 

the same project in the project manager.

 

 

 

An Ethernet station needs an allocation table containing the IP address and IP node of allstations in the network. This allocation table is generated automatically by the hardware configurator and downloaded in a DBX on the PCD.<?xml:namespace prefix = o ns = "urn:schemas-microsoft-com:office:office" />

 

The hardware configuration of all PCD systems in the Ethernet must therefore be defined in

the same project in the project manager.

 

If several people are programming different PCD stations in the same project, it is

recommended that the whole network configuration should first be defined on one

programming PC. This configuration should then be copied or imported onto the other

programming PCs.

 

 

 

Categories

Communication / Ether-S-Bus

Last update: 24.05.2015 21:44

First release: 28.06.2004 07:43

Views: 3000

The requested software / document is no longer marketed by Saia-Burgess Controls AG and without technical support. It is an older software version which can be operated only on certain now no longer commercially available products.

Download